Factory Direct Sell Heavy Duty Two or Tri axle LPG Tank Trailer 35 cbm ~ 60 cbm LPG transport trailer
Opting ASME standard LPG Tanker Trailer for propane
As below for 60 m3 model for reference
|
Tare Weight
|
11500KGS
|
Pay Load
|
25000KGS
|
Overall Length
|
11400mm
|
Overall Width
|
2480mm
|
Photo for reference, finial product can be made according to exact requirements
|
Tank
|
Transporting Media
|
Dimethylmethane, Liquid Ammonia, Liquid SO2, LPG,Butane
|
Shape
|
Round Shape
|
Total Volume(m3)
|
60 cbm 60 m3 60000 Liters
|
Tanker Body Steel Sheet
|
Q345R/12 mm
|
End plate
|
Q345R/14 mm, by punching
|
Parts for Tank
|
Manhole cover
|
3 sets of 500mm/Q345R manhole fixed on top of Tank, with breather valve
|
Unloading valve
|
2-3 sets of DN80 fixed at button of Tank
|
Pipeline at button of tank
|
4"seamless steel tube/Q345
|
Labeling system
|
Oil Type Indication
|
Anti-static electricity system
|
pulling, wire carrier, sheet copper (6 sheet-standard layout)
|
Other Parts
|
Ladder
|
1 unit at front of Tank
|
Guard on top of Tank
|
Zinc galvanized -guard-net
|
Oil hose box
|
Circular single hole tube, 1 unit on each side
|
Oil hose
|
2 unit, 3" x 6m size in black rubber
|
Side guard
|
cross bar-structure
|
Rear button guard
|
Fixed type
|
Work tank deck
|
Box type
|
Fire extinguisher box
|
2 unit at the back of each side
|
Mud guard
|
Steel structure in trapezoid form
|
Lights and wire
|
24V, 7 coils with lights for parking, reverse, instruction, head lamp and end lamp
|
Chassis
|
Main Beams
|
Heavy duty and extra durability designed; Opting for high tensile steel Q345R,welded by automatic Submerged-Arc processes
|
Axle
|
3 axle
|
BPW brand FUWA brand
|
Landing Gear
|
JOST Two-speed, manual operating, heavy duty landing gear
|
King Pin
|
JOST 2"standard bolt-in king pin
|
Suspension
|
German design mechanical suspension
|
Pneumatic Braking System
|
WABCO RE 6 relay valve; T30/30+T30 Spring brake chamber; 45L air tanks.
|
Wheel rim
|
8.25R22.5 wheel rim
|
Tire
|
11R22.5 tubeless tire with one spare tire
|
Painting
|
Complete Chassis sand blasting to clean rust, 1 coat of anticorrosive prime, 2 coats of final pain
|